Construction

Competency Assessment

Why should you have a 100mm step down to truck area?

The swing out legs & jacks may be used to completely support the weight of a full Quickfill® tower

What is the minimum pad size requirement?

What must be done before standing a Quickfill® tower?

After connecting the crane to the master link, you can you pull the lifting hook down using the retrieval chain

When is it permissible to climb the Quickfill® tower?

An empty Quickfill® approximate weight is?

If filling using a pump, you may need to connect the 80mm bypass return line

Spares are provided in case of gasket or valve damage

The Quickfill® tower can be left erected & empty when a cyclone or very strong winds are predicted.

web design by city of cairns.com